Automatic four-pipes Belling Machine
Automatic Double-pipes Belling Machine
Automatic Belling Machine
Fully Automatic Rieber Belling Machine
Automatic Belling Machine
Fully Automatic Rectangular Belling Machine
Rieber Belling Machine
Manual Pipes Fittings Belling Machine
Semi Automatic Belling Machine
PVC-O Automatic Belling Machine
Changzhou hua hui plastic machinery co., LTD
Mobile:15351911555
Phone:0519-83201222
Fax:0519-83153678
Email:690420678@qq.com
Address:Changzhou wujin district bull-running industrial park
Belling machine installation steps and matters needing attention
A, foundation requirements
Pouring concrete, concrete thickness must be greater than 100 mm;
Should guarantee the concrete surface smooth;
Second, will separate the bracket and using the flaring of two parts in the installation location to join together, other install screw fastening.
Three, if online production, install the central axis of the unit should be with the axis of the production line, and the center height were adjusted.
Four, on the machine before and after the direction, the level of the left and right.
Five, and went to the tank into the pure YA - N46 160 litres of hydraulic oil, the oil to keep it clean without impurities, oil should be injected by filtering device.
Six, all lifting screw, guide pin, guide bar, chain, sprocket filling amount of grease.
Seven, according to the circuit diagram access power bus and the line of control.
Eight, according to the hydrographic chart to install water supply and drainage duct and the hose connection machine.